Typical Standard ~10 days (prod + air sketch) · Express ~6 days · down to 0.001 mm

China supplier channel

Idle spindles cost money — plug overseas orders into your shop floor

Zoryra Precision opens a preferred-supplier track for China CNC / sheet / 5-axis shops. Overseas buyers upload CAD for AI itemized quotes every day — after approval, matched RFQs can keep flowing. Free to apply. No franchise fee. No forced monthly volume.

  • Overseas RFQsUS/EU/JP/KR/SEA buyers seeking China capacity
  • AI matchRoute jobs by process, material, lead tier
  • Dispatch modelApproved shops get dispatched jobs — no public bidding war
  • Dongguan hubFactory visits · QA coordination · export packing
China supplier channel

Why China shops join Zoryra Precision

Same playbook as leading on-demand networks — tuned for Dongguan cluster shops.

Real overseas demand

Buyers upload CAD, see AI itemized quotes, pick lead tiers — approved suppliers get matched capacity jobs. Stop fishing in WeChat groups.

Your spindles become sales

Zoryra Precision covers acquisition, pre-quote screening and engineering chat — you cut, finish, inspect, ship. Fill idle time; take what fits in peak weeks.

Free join, flexible accept

No franchise fee, no forced monthly volume. Pause when full; surge when idle. Fits VMC, mill-turn, 5-axis, sheet, proto lines.

QA & lead coordination

Critical dims, finishes, inspection docs clarified before PO; production vs shipping days shown separately — fewer handshake fights.

Zoryra Precision features for suppliers

Buyers already use AI Instant Quote. Suppliers need: where jobs come from, how CAD moves, how engineering chats, how money and lead times align.

AI acquisition & itemized quote

Buyers self-serve STEP/STL and see material / machine / setup / finish / lead-tier lines in minutes — you get priced intent, not blank RFQs.

AI quote hub →

CAD privacy & engineering

HTTPS, file allow-list, optional NDA. Complex jobs escalate to engineers — fewer fantasy tolerances.

CAD privacy →

Lead tiers & export

Economy / Standard / Express split production vs air sketch. Shops schedule by tier; logistics follow the sketch.

How it works →

Dongguan visit & QA docs

Buyers can book visits; dims / FAI / CMM optional per order. Show real capability, not slogans.

Factory →

Four steps to preferred supplier

  1. 01
    Submit application

    Company, processes, capacity, contact — clearer forms get matched faster.

  2. 02
    Screen & capability check

    We check process range, QA habits, lead response — video or on-site if needed.

  3. 03
    Sample / pilot (as needed)

    Critical parts may start with a pilot lot — dims, finish, packing — then scale.

  4. 04
    Activation & password

    After approval we email a set-password link — then sign in for dispatches and cost/lead quotes.

Shops that should apply now

  • VMC / HMC · 3-axis milling
  • Mill-turn · shafts & sleeves
  • 5-axis · fewer setups
  • Sheet laser + bend
  • Proto / low-volume Al & SS
  • Shops with export packing & QC habits

Supplier FAQ

Password on apply?

No. The form is factory & contact info only. After activation we email a set-password link — then sign in.

Is there a fee?

Application is free. We don’t sell franchise fees. Commercial terms are clarified in review.

Guaranteed orders?

No “get rich guaranteed” pitch. We prioritize matched overseas RFQs — you decide what to accept.

Small shops OK?

Yes. We care about machines, process stability, QA habits — not a fancy showroom.

CAD security?

HTTPS uploads, allow-list & size caps, optional NDA — see CAD privacy.

Apply now — sell idle capacity overseas

Submit plant & equipment details — no separate supplier sign-up. Signed-in buyers link this application to their account automatically.

Email: [email protected]

How to apply — follow the steps for your situation:

  1. 1
    Fill in the form below

    No sign-in or password. Company, processes, capacity, contact — that’s it.

  2. 2
    Submit & watch your inbox

    Review updates within 1–3 business days by email.

  3. 3
    Platform review

    We verify process & QA habits; may request more info or a video/on-site visit.

  4. 4
    Activate → set password → sign in

    Email with set-password link → partner hub for dispatches, cost & lead time.

Loading…

Every idle day costs — apply today

Jump to form
QuoteEmail
Join Zoryra Precision Supplier Network | Overseas CNC Orders for China Factories — Zoryra Precision