Problem: EV Fixture Calendar Slips After Coating — Split the Clock

Problem: buyer plans a 10-day pilot for jigs / battery brackets, then powder or black oxide adds a silent week and the line trial slips.

Root cause: RFQ says “as soon as possible” without finish; the portal quote looked short because coating was not selected.

Fix: (1) Lock material grade + coating on day one. (2) Read production days and courier days as two lines. (3) Use Express only when blank + light finish allow.

Reference: blast +1–2d, powder +3–5d on the production clock — see Materials & finishes atlas.

Upload the fixture STEP on the quote page, pick the real finish, and share pilot qty + reorder rhythm with engineering.

KimantafarashinAIEmail
PDF

Ana so a yi amfani da imel na aiki ([email protected]). Imel na kashin kai ma yayi. Zaɓi ne — saukarwar har yanzu tana aiki.

Zamu yi amfani da wannan imel na aiki ne kawai don aika wannan abu da kuma amsa tambayoyinku na injiniya (farashi, lokacin jagora, zanen kaya).

Problem: EV Fixture Calendar Slips After Coating — Split the Clock — Zoryra Precision