STEP / STL / IGES — preview before sign-in.
Zoryra Precision
5-Axis CNC yn Dongguan, Sina | Zoryra Precision
Zoryra Precision 5-as yn Dongguan, Sina: komplekse gesichten, mearsidige dielen, minder opset. NDA en CMM opsjoneel. Standert net flechtkritysk. Gjin útfûn AS / ISO nûmers.
- Minder opset
- Komplekse oerflakken
- Engineer backup
- FAI / CMM opsjoneel

Three steps to start
Material, qty, finish, lead tier, inspection.
Escalate complex jobs; Dongguan, China produce & ship.
Lead time split
Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.
Long-tail use cases
Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.
When 5-axis helps
Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.
Quality docs & privacy
CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.
Datum & inspection
Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.
Category depth
Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.
Engineering review
5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.
Capability specs & DFM
| Item | Spec |
|---|---|
| Brûk gefallen | Komplekse oerflakken, dielen mei meardere gesichten, minder opset |
| Tolerânsje doel | ± 0,002 mm fine doelen mienskiplik mei CMM check |
| Materialen | Aluminium, RVS, arkstiel, plestik |
| Min funksje | Tool diameter & berik beheind - diel STEP betiid |
| DFM tip | Define datum skema dúdlik; foarkomme oer-tolerânsje frije oerflakken |
Wa masines it, en wêr
Dielen binne fabryk-direkt fan Dongguan Zerui Precision Manufacturing Co., Ltd. yn Dongguan, Sina, Guangdong. Outward merk: ZORYRA / Zoryra Precision.
fan 1 st. Nei CAD upload krije jo in AI itemized referinsje; fêste oarders folgje de tekening en it ôfpraat betellingsknooppunt. Wy jouwe plantfoto's fan tredden net troch as ús line.
Dizze side toant gjin útfûne ISO / AS / FDA-nûmers. Systemen dy't wy net hâlde, wurde net skreaun as hâlden. Fabryksbesites kinne wurde regele.
Zoryra Precision 5-as yn Dongguan, Sina: komplekse gesichten, mearsidige dielen, minder opset. NDA en CMM opsjoneel. Standert net flechtkritysk. Gjin útfûn AS / ISO nûmers.
Komplekse gesichten en mearsidige dielen brûke 5-as om opstellingen te snijen. Net tefolle tolerânsje frije oerflakken; skriuw datums en stjoer STEP betiid. Standert net flechtkritysk.
Typyske dielen
- Multi-face húsfesting
- Komplekse oerflakken
- Minder opset struktueren
- Hoeke gatten
- Impeller neistlizzend (net flechtkritysk)
- Ien-stik ynterfaces
Materialen en finishen
- 7075 — hege sterkte, minder opset
- 6061 — komplekse húsfesting
- 304 — multi-face roestvrij, passivate
- POM — multi-face engineering plestik
DFM: datum skema, frije oerflakken, opsetten
- Skriuw it datumskema; net oer-tolerânsje frije oerflakken
- STEP om te besjen ark berik
- Mark clamp gesichten en keep-outs op it model
- CMM as ticked - net in standert folsleine grutte scan
Ynspeksje en dokuminten (lykas oankeard)
- Ofmjittingsrapport as oantekene
- FAI as ticked
- CMM as oanwiisd
- Materiaal certs per bestelling oerienkomst
Leadtiid (klok begjint by it betellingsknooppunt)
Lead tiers: Ekonomy / Standert / Express. Standert giet oer 10 wurkdagen as referinsje; Express oer 6 as kapasiteit it talit.
De klok begjint by it ôfpraat betellingsknooppunt. Anodize, poeder, passivate, en útbestege waarmte-treat dagen sitte op dy klok.
Titanium, dikke hurde jas, ynserts, en komplekse gauges opnij klok. De sitaatskets regearret.
Wat wy net dogge
- Net flechtkritysk as ITAR standert
- Gjin útfûn AS / ISO
- Implantaten bûten it berik
- Net alle gemalen diel rint 5-as
FAQ
Listje jo hjir ISO / AS / FDA-nûmers?
Gjin útfûn nûmers. Systemen dy't wy net hâlde, wurde net skreaun as hâlden. Fabryksbesites kinne wurde regele.
Nim jo 1 pc?
Ja. Nei CAD krije jo in AI itemized referinsje; fêste oarders folgje de tekening en betelling node.
Wannear begjint de leadklok?
Op it ôfpraat betellingsknooppunt. Anodize, poeder, passive dagen sitte op 'e klok. Tiers op it sitaat: Ekonomy / Standert / Express.
Is 5-as de standert?
Nee, wy evaluearje it as funksjes minder opset nedich binne of komplekse gesichten.
Flight-krityske dielen?
Not by default. Scope soe wêze in aparte oerienkomst - en wy net útfine AS nûmers.
Is every complex part a 5-axis job?
Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.
What does ~6 days express mean?
A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.
Do you show ISO certificates on this landing?
Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.
What is 5-axis CNC machining?
The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.
What travel / envelope should I expect?
Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.
Why does 5-axis often cost more?
Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.
Which finishes work on 5-axis parts?
Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.
What files work best?
Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.
Other capabilities
Upload CAD for an itemized reference
AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.
