Engineering first
Titanium often needs tooling and fixturing confirmation. Use Talk to an Engineer for complex envelopes.
Zoryra Precision
Ti6Al4V and related grades for high-strength, light parts — lead time and tooling confirmed by engineering.
Titanium often needs tooling and fixturing confirmation. Use Talk to an Engineer for complex envelopes.
Ti6Al4V is the usual request. Lead time follows Economy / Standard / Express — machining hours are higher, so totals rise even on Standard.
We do not advertise aerospace-flight-critical titanium as a default line. Drawing, heat-treat state, and inspection tier govern each job.
| Item | Spec |
|---|---|
| materyal | bahin6bahin4V bahin |
| tan-aw | inhinyero bahin bahin & adlaw |
| DFM bahin | bahin STEP bahin alang bahin bahin |
No — Economy/Standard/Express tiers still apply; machining hours are higher so totals rise.
AI Instant Reference Quote + engineering review within 12 business hours.
Kini nga panid alang sa presyo sa CNC. Ingna ang materyales, sama sa 6061 aluminyo o asero nga dili tayaon, ibutang ang toleransiya sa drowing, ug ang gidaghanon. Kasagaran nga panahon 8–10 ka adlaw, gikan sa usa ka piraso.
Kini nga panid alang sa presyo sa CNC. Ingna ang materyales, sama sa 6061 aluminyo o asero nga dili tayaon, ibutang ang toleransiya sa drowing, ug ang gidaghanon. Kasagaran nga panahon 8–10 ka adlaw, gikan sa usa ka piraso.