Engineering first
Titanium often needs tooling and fixturing confirmation. Use Talk to an Engineer for complex envelopes.
Zoryra Precision
Ti6Al4V and related grades for high-strength, light parts — lead time and tooling confirmed by engineering.
Titanium often needs tooling and fixturing confirmation. Use Talk to an Engineer for complex envelopes.
Ti6Al4V is the usual request. Lead time follows Economy / Standard / Express — machining hours are higher, so totals rise even on Standard.
We do not advertise aerospace-flight-critical titanium as a default line. Drawing, heat-treat state, and inspection tier govern each job.
| Item | Spec |
|---|---|
| danvez | pezh6pezh4V pezh |
| gwelet | ijinour pezh pezh & deiz |
| DFM pezh | pezh STEP pezh evit pezh pezh |
No — Economy/Standard/Express tiers still apply; machining hours are higher so totals rise.
AI Instant Reference Quote + engineering review within 12 business hours.
Ar bajenn-mañ a zo ur c'hinnig CNC. Lavarit an danvez, evel aluminiom 6061 pe dir hep mergl, lakait an derez war an tres hag an niver. An amzer boas a zo 8–10 devezh, adalek ur pezh.
Ar bajenn-mañ a zo ur c'hinnig CNC. Lavarit an danvez, evel aluminiom 6061 pe dir hep mergl, lakait an derez war an tres hag an niver. An amzer boas a zo 8–10 devezh, adalek ur pezh.