Tokbaot standet ~ 10 dei (Prodak + Ea Sketch) · Fast ~ 6 dei · Droing/DFM

Zoryra Precision

Faef aksis CNC masin long Dongguan, Jaena | Zoryra Precision

Zoryra Precision 5-aksis long Dongguan, Jaena: ol kompleks fes, ol haf blong plante saed, mo smol nomo. Ol NDA mo CMM oli save jusum. I no impoten tumas blong flae. I no gat wan namba blong AS/ISO we oli wokem.

  • Smol Ol Plan
  • Ol Man We Oli Stap Faet
  • Enjinia Bakopi Bakopi
  • FAI/CMM i jusum

Three steps to start

1Upload CAD

STEP / STL / IGES — preview before sign-in.

2Configure

Material, qty, finish, lead tier, inspection.

3Confirm

Escalate complex jobs; Dongguan, China produce & ship.

Lead time split

Express reference ≈ 3 days production + 3 days shipping sketch ≈ 6 days total. Standard ≈ 10 days. Quotes always show production and shipping separately.

Long-tail use cases

Common quote paths: robotics EOAT with compound angles, UAV arm connectors, AI cold plates / GPU brackets, electronics housings with undercuts, and non-implant medical interfaces — see industry pages + problem guides, then upload STEP.

When 5-axis helps

Compound angles, deep undercuts reachable in one setup, and organic surfaces that are costly on 3-axis. We still recommend 3-axis when it is cheaper after DFM.

Quality docs & privacy

CAD privacy / NDA options, dimensional reports, FAI, and CMM on request. Factory-direct Dongguan, China. Certification details are shared when available for qualified buyers.

Datum & inspection

Define datum schemes clearly. Fine targets around ±0.002 mm / down to 0.001 mm capability are common with optional CMM / dimensional reports selected in the quote.

Category depth

Pair this page with materials & finishes, industries, milling, and turning hubs — same transparent quote engine everywhere.

Engineering review

5-axis jobs often need DFM alignment — live chat or email within 12 business hours. Large STEP files belong in Upload for quote.

Common materials

7075TaitaniumStainles aeelOl Plastik Blong Wokem Ol Man
Open materials atlas →

Capability specs & DFM

ItemSpec
Ol Stori Blong YusumOl ples we oli had, ol haf we oli gat plante saed, mo smol ples we oli putum
Ol Mak Blong Kasem Ol Mak Blong Kasem± 0.002 mm naesfala mak, CMM eksam i plante taem
Ol Samting BlongAluminium, steinles aean, aean, plastik
Samting We i Smol NaoTul Diamita mo Scope Limited—Serem Ol Step Fastaem
Ol DFM We Oli TingbaotTokbaot klia plan blong benchmark; No Mekem Tingting Blong Fri We Oli Fri

? ?

Ol pat oli kam stret long Dongguan Zerui Precision Manufacturing Co., Ltd., long Dongguan, Guangdong, Ol narafala bren: Zoryra/Zoryra Precision.

Stat wetem 1. Afta we yu putim CAD, bae yu kasem wan refrens blong AI; Mekem se oda ia i folem ol droing mo ol node we oli agri long hem blong pem. Mifala i no giaman olsem ol foto blong ol fektori blong namba tri man olsem ol prodak laen blong mifala.

Pej ia i no soem ol stori namba blong ISO/AS/FDA. Ol sistem we yumi no holem, oli no raetem se i holem. Yu save mekem plan blong visitim ol faktori.

Zoryra Precision 5-aksis long Dongguan, Jaena: ol kompleks fes, ol haf blong plante saed, mo smol nomo. Ol NDA mo CMM oli save jusum. I no impoten tumas blong flae. I no gat wan namba blong AS/ISO we oli wokem.

Ol kompleks fes mo ol haf we oli gat plante saed oli yusum 5-aksis blong katem. Yu no mas letem fasin fri blong yu i kam fri tumas; Raetemdaon wan benchmark mo sendem ol step fastaem. I no impoten tumas blong flae.

Ol Haf We Oli Stap

  • Ol sel we oli gat plante saed
  • Ol Man We Oli Stap Faet
  • Smol Stori Blong Stap Blong Stap
  • Ol hol we oli leftemap
  • Ol impeller oli stap klosap long narafala (i no impoten tumas blong flae)
  • Wan Infes We i Joen

Ol Samting We Oli Fasem Ol Samting

  • 7075 — I gat bigfala paoa, i no moa gat plante samting
  • 6061 — Ol Haos We Oli Haed
  • 304 — Stainles aean we i no gat plante saed
  • POM — Ol plastik we oli wokem plante saed

DFM: Benchmark Skema, Fri Pes, Seting

  • Rerem ol benchmark program; Yu No Mas Letem Tumas Ol Fri We Oli Fri
  • Ol Stamba Blong Jekem Ol Tul Blong Hem
  • Makem ol fes mo ol spes long model
  • Jekem CMM—I no wan ful-saes skening we i no defaolt

Ol inspeksen mo ol pepa (olsem long mak blong mak)

  • Ripot Blong Dimensen Oli Jekem
  • Jekem faea
  • Jekem CMM
  • Ol Setifiket Blong Wanwan Oda Agrimen

Fastaem (klok i stat wetem node blong pem)

Klas blong Lida: Ekonomi Klas/Standard Klas/Fast Klas. Standet ia i blong samwe 10 dei blong wok blong hem; Sipos ol man oli gat raet, oli talem samwe long sikis wod.

Klok ia i stat wetem wan node we i agri blong pem. Long klok ia, ol dei blong anodizing, paoda, ol samting we oli mekem, mo ol samting we oli yusum long hot, mo ol samting we oli yusum long hem.

Titanium, ol had koting, ol insaed, mo ol had instrument, oli jenisim taem bakegen. Ol kwotesen oli gat paoa long paoa.

Ol Samting We Yumi No Mekem

  • I no impoten tumas blong flae o ITAR
  • AS/ISO we i no bin wokem
  • Ol Plant Blong Plant Oli No Stap
  • I no evri haf blong miling i ron long faef aksis

FAQ

Yu yu stap listim ol namba blong ISO/AS/FDA long ples ia?

I no gat ol stori namba. Ol sistem we yumi no holem, oli no raetem se oli holem. Yu save mekem plan blong visitim ol faktori.

? Yu yu wantem wan pis?

Yes. Afta long CAD, bae yu kasem wan smol refrens blong AI; Mekem se oda ia i folem ol node blong karemaot mane mo pem.

? Wetaem bel ya i stat?

Long taem blong pem pei node we oli agri. Ol dei blong anodizing, paoda, mo ol dei we oli no save mekem, oli sidaon long klok. Kotesen Level: Ekonomik Klas/Standet Klas/Ekspresi Klas.

? Ol faef aksis oli no stret? ?

Nogat, sipos i nidim smol ples no i had blong mekem ol samting we oli had long hem, bambae yumi skelem ol samting ya.

? Ol Impoten Samting Blong Flaen?

Hemia i no olsem. Bambae i wan agrimen nomo—bae yumi no save mekem ol namba.

Is every complex part a 5-axis job?

Not always — some parts are cheaper with smart 3-axis setups. We recommend the economical path after DFM.

What does ~6 days express mean?

A reference split: production + international shipping sketch for the Express tier. Actual dates depend on material, finish, queue, and carrier — shown itemized on your quote.

Do you show ISO certificates on this landing?

Only when a verifiable copy is available for qualified buyers. We emphasize NDA, inspection options, and factory-direct service.

What is 5-axis CNC machining?

The tool or table moves in five degrees of freedom so complex faces can be reached in fewer setups than 3-axis — useful for compound angles and organic surfaces.

What travel / envelope should I expect?

Envelope depends on the assigned machine after DFM. Share overall size early; oversized parts are reviewed before acceptance.

Why does 5-axis often cost more?

Programming, fixtures, and spindle time are higher — but fewer setups can reduce total cost vs multi-setup 3-axis. We recommend the cheaper valid path after DFM.

Which finishes work on 5-axis parts?

Same atlas as milling: as-machined, blast, anodize (Al), passivate (SS), powder, polish. Finish days add to the production clock — see Materials & finishes.

What files work best?

Native STEP preferred so we can evaluate tool access; PDF drawings for GD&T and notes.

Upload CAD for an itemized reference

AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.

OlKworomEmail
PDF

Wok imel ([email protected]). Ol leta blong yuwan oli save givhan long hem. Ol Downlod—Ol Downlod Oli Stap Stret yet.

Bae mifala i yusum wok imel ia nomo blong sendem projek ia mo ansarem ol kwestin blong yu long enjiniaring (kwotesen, deliveri deit, droing).

Faef aksis CNC masin tul long Dongguan, Saena | Ol kompleks surface daonem ples | Zoryra Precision