Typical parts
Brushless motor mounts (M2/M3 patterns) · Gimbal / camera damping brackets · Arm-to-frame connectors · Battery tray slide rails & latches
Zoryra Precision
Weight-first milling for flight hardware — pocketing strategy, anodize keep-outs, and honest lead tiers for 1–50 pc pilot batches.

UAV buyers iterate fast on motor mounts, gimbal brackets, arm connectors, and battery rails. Share mass targets and mating faces early — we flag thin-wall and anodize risks in DFM before chips fly.
Material path: Al6061-T6 for most structures; 7075 when strength per gram matters (motor mounts, landing gear). Finish: clear / black anodize common; mask threads and arm mating faces unless drawn.
Process: 3-axis pocketing for most brackets; 5-axis when compound arm angles or undercuts reduce setups. Standard tier ≈ 10 days reference (production + air sketch) with anodize on the clock.
See anonymized cases below — arm connector, motor mount, gimbal bracket, battery tray — then upload STEP for an itemized reference quote.
Brushless motor mounts (M2/M3 patterns) · Gimbal / camera damping brackets · Arm-to-frame connectors · Battery tray slide rails & latches
Structural mounting ±0.05 mm typical; bearing / shaft bores per drawing (H7 common); flat damping faces 0.05–0.1 mm when called out. Drawing governs.
Weight targets · Thin-wall notes · Anodize color + masking · 1–50 pc batches
Structural mounting ±0.05 mm typical; bearing / shaft bores per drawing (H7 common); flat damping faces 0.05–0.1 mm when called out. Drawing governs.
Material · kritik tol. · dürüst CNC əhatə dairəsi. İş üçün kart açın və ya sitat gətirmək üçün STEP yükləyin. Şəkillər üçüncü tərəfin zavod çəkilişləri deyil, hissə illüstrasiyalardır.
6061 for most quadcopter mounts; 7075 when strength per gram or thread pull-out is critical — note it on the RFQ for accurate lead & cost.
Yes — mark keep-out faces on the PDF; we mask threads and arm interfaces before anodize by default unless the drawing says otherwise.
Standard ≈ 8–10 days reference with clear/black anodize (production + air sketch). Express when blanks are ready and finish is light.
Yes — upload STEP; we quote 3-axis vs 5-axis in DFM when undercuts or compound angles would otherwise need multiple setups.
AI Instant Reference Quote + engineering review within 12 business hours.
İş e-poçtuna üstünlük verilir ([email protected]). Şəxsi poçt qaydasındadır. Könüllü - yükləmə hələ də işləyir.
Biz bu iş e-poçtundan yalnız bu elementi göndərmək və mühəndislik suallarınızı cavablandırmaq üçün istifadə edəcəyik (sitat, sifariş müddəti, çertyojlar).