Tipiese standaard ~10 dae (prod + lugskets) · Ekspres ~6 dae · tekening / DFM

2026-08-10 · 4 min

Problem: Lab Fixture Audit Stalls Without Dim Reports — What to Select

Problem: instrument / lab fixtures arrive on time, but IQ/OQ or supplier audit stalls because dimensional reports, material CoC, or NDA wording were never scoped.

Boundary: we machine non-implant housings and lab structures — not implants / ITAR by default. Factory visits can be booked via contact.

Fix: at quote select Dimensional report / CMM / FAI / CoC as needed; send NDA early; call out passivation or anodize + cleaning notes on the drawing.

Lead sketch: Standard ≈ 10 days reference (production + air). Extra inspection adds calendar days — shown separately from courier days.

Upload CAD on the quote page with the QA checkboxes you need, then book a visit if your QA team must see QC in Dongguan, China.

KIkwotasieEmail
PDF

Werk-e-pos word verkies ([email protected]). Persoonlike e-pos is OK. Opsioneel — die aflaai werk steeds.

Ons sal hierdie werk-e-pos slegs gebruik om hierdie item te stuur en om jou ingenieursvrae te beantwoord (kwotasie, leityd, tekeninge).

Problem: Lab Fixture Audit Stalls Without Dim Reports — What to Select — Zoryra Precision