Documentos passant in HTTPS. NDA b'est. Custa pàgina est unu preventivu CNC. Nara su materiale, comente allumìniu 6061 o atzàrgiu chene ossidu, pone sa toleràntzia in su disinnu e sa cantidade. Su tempus normale est 8–10 dies, dae unu pezzu.

Zoryra Precision

Stainless Steel CNC Machining

Corrosion-resistant parts for equipment, fixtures, and export hardware.

  • 304 / 316
  • acabu parte
  • parte parte
  • nono acabu

Three steps to start

1Upload CAD

STEP / STL / IGES — preview before sign-in.

2Configure

Material, qty, finish, lead tier, inspection.

3Confirm

Escalate complex jobs; Dongguan, China produce & ship.

Grades & finishes

SS304/SS316 common; passivation and polish available as selectable finishes.

Lead time note

Stainless often machines slower than aluminum — reference days still split production vs shipping in quote.

Common materials

30431630317-4PH
Open materials atlas →

Capability specs & DFM

ItemSpec
materiale304 / 316 / 17-4PH (subra parte)
tolleràntzia±0.002–0.01 mm parte; traballu-parte parte
acabutraballu, acabu, parte
DFM parteparte parte parte; parte parte-parte atzàrgiu parte

Upload CAD for an itemized reference

AI Instant Quote + engineer backup in business hours. No 3D printing / injection / die casting.

AIpretzucurrèu
PDF

Custa pàgina est unu preventivu CNC. Nara su materiale, comente allumìniu 6061 o atzàrgiu chene ossidu, pone sa toleràntzia in su disinnu e sa cantidade. Su tempus normale est 8–10 dies, dae unu pezzu.

Custa pàgina est unu preventivu CNC. Nara su materiale, comente allumìniu 6061 o atzàrgiu chene ossidu, pone sa toleràntzia in su disinnu e sa cantidade. Su tempus normale est 8–10 dies, dae unu pezzu.

Stainless Steel CNC Machining | 304 & 316