Fisie taaba HTTPS. NDA be. Seb-kãngã CNC yoodo la bõ. Vũlg neng, 6061 alumini la tõnd ka yõkr ye, pagt toleraans wẽnd go, la yoodbõ. Raare 8–10, yembre a ye.

2026-08-10 · 4 min

Problem: Lab Fixture Audit Stalls Without Dim Reports — What to Select

Problem: instrument / lab fixtures arrive on time, but IQ/OQ or supplier audit stalls because dimensional reports, material CoC, or NDA wording were never scoped.

Boundary: we machine non-implant housings and lab structures — not implants / ITAR by default. Factory visits can be booked via contact.

Fix: at quote select Dimensional report / CMM / FAI / CoC as needed; send NDA early; call out passivation or anodize + cleaning notes on the drawing.

Lead sketch: Standard ≈ 10 days reference (production + air). Extra inspection adds calendar days — shown separately from courier days.

Upload CAD on the quote page with the QA checkboxes you need, then book a visit if your QA team must see QC in Dongguan, China.

AIligdi-soabasebere-ka
PDF

Seb-kãngã CNC yoodo la bõ. Vũlg neng, 6061 alumini la tõnd ka yõkr ye, pagt toleraans wẽnd go, la yoodbõ. Raare 8–10, yembre a ye.

Seb-kãngã CNC yoodo la bõ. Vũlg neng, 6061 alumini la tõnd ka yõkr ye, pagt toleraans wẽnd go, la yoodbõ. Raare 8–10, yembre a ye.

Problem: Lab Fixture Audit Stalls Without Dim Reports — What to Select — Zoryra Precision