Problem: EOAT Datum Stack Won’t Assemble — Fix Before You Reorder

Problem: pilot EOAT / flange plates look fine as singles, then the cell won’t stack — dowels fight, camera mounts twist, Helicoil height drifts.

Root cause (usual): drawing marks ±0.1 mm everywhere, but mating faces / datums that actually locate the robot need ±0.02–0.05 mm; insert callouts and anodize masking are missing.

Fix: (1) Put a datum scheme on the PDF. (2) Call out only the fit faces tighter. (3) Name insert type + depth. (4) Mask threads before anodize.

Lead sketch: Standard ≈ 5d production + air sketch ≈ 10d total once blanks are ready — Express when finish is light.

Next step: upload STEP + PDF on the quote page so we itemize inserts, masking, and inspection before you reorder scrap.

एआईउद्धरणईमेल
PDF

कार्य ईमेल को प्राथमिकता ([email protected])। व्यक्तिगत मेल ठीक है. वैकल्पिक - डाउनलोड अभी भी काम करता है।

हम इस कार्य ईमेल का उपयोग केवल इस आइटम को भेजने और आपके इंजीनियरिंग प्रश्नों (उद्धरण, लीड समय, चित्र) का उत्तर देने के लिए करेंगे।

Problem: EOAT Datum Stack Won’t Assemble — Fix Before You Reorder — Zoryra Precision