Typical Standard ~10 days (prod + air sketch) · Express ~6 days · drawing / DFM

2026-08-06 · 6 min

Case: 5-Axis Al7075 Housing — ±0.01 mm, Express ~6 Days

Part type: compact equipment housing with compound undercuts that would need multiple 3-axis setups.

Material: Al7075-T6. Finish: bead blast + black anodize on exterior; as-machined sealing faces.

Tolerances: primary datums ±0.01 mm; sealing flatness 0.05 mm; general ±0.1 mm. Capability down to 0.001 mm only where drawn.

Process: 5-axis rough + finish in two setups. DFM saved one fixture vs 3-axis path — quoted both options, buyer chose 5-axis for schedule risk.

Lead time: Express reference ≈ 3 days production + 3 days air sketch ≈ 6 days. Hard anodize would add finish days — not used here.

Upload complex STEP to the 5-axis landing for instant quote; ask engineering if 3-axis is cheaper after DFM.

एआईउद्धरणईमेल
PDF

कार्य ईमेल को प्राथमिकता ([email protected])। व्यक्तिगत मेल ठीक है. वैकल्पिक - डाउनलोड अभी भी काम करता है।

हम इस कार्य ईमेल का उपयोग केवल इस आइटम को भेजने और आपके इंजीनियरिंग प्रश्नों (उद्धरण, लीड समय, चित्र) का उत्तर देने के लिए करेंगे।

Case: 5-Axis Al7075 Housing — ±0.01 mm, Express ~6 Days — Zoryra Precision